Overview
Once a design is priced and used, the rest is largely automatic. You register it, and from then on Oxygen acts only on dates and guardrails: it switches the change on and off on the planned days, checks that each switch happened, watches the safety limits, and closes the run when the last day has been measured. Nobody edits a running experiment, and nothing happens because someone looked at it.Registering
Register is available on a priced draft to workspace owners and admins. The confirmation says it plainly: “Registering is final: the design can no longer be edited, and it cannot be undone. The platform starts flipping the lever on schedule.” Registration is refused unless:- the draft has been priced and a design used, so it has a schedule, a seed and a promised detectable effect;
- the request arrives before the registration deadline: the start of the first switch day, less the anticipation buffer, in the design’s time zone, by the platform’s own clock (at hour grain, the switch hour less the buffer in hours);
- both lever automations still exist and are unambiguous (they may have been renamed since pricing);
- the draft is the one you were looking at (nobody saved over it in the meantime); and
- the experiment has no run yet. One experiment has one run.
Why registration is the proof
The registration time is set by the platform’s clock when the request arrives, and from that moment the design is locked in the database: it cannot be edited or deleted. Because that time must fall before the deadline, it proves the design was written down before anyone could have seen it move. Nothing about the plan can change afterwards, so the report a year later grades the same plan. To change a registered experiment, use Duplicate as new draft. The copy is a new experiment with its own draft and, eventually, its own run.Fixing the control group
Shortly after registration, the first background check reads the warehouse and fixes, once and for all:- the control group: every unit with outcome data over the last before-window’s worth of days that no wave names;
- for a group design, which units belong to which group;
- for a switchback, the fleet: the units with data in the last 28 days.
Switching the change on and off
Oxygen’s scheduler checks every experiment every few minutes, and also wakes at the first moment of each switch and of the close in the design’s time zone: the start of the day, or at hour grain the switch hour itself. When a switch is due it records one row per unit and switch, then runs your automation: once per unit, or once per wave, depending on How runs are made. Each row records which automation ran and which version of the workspace it came from. The rows are unique per unit, state and switch moment, so a repeated check can never switch a unit twice. For a switchback, every unit in the fleet is switched at every period boundary. A period that has already ended without its switch being sent is skipped rather than replayed late. If a switch fails, Oxygen does not keep retrying it. The run is marked failed, the owner is told once, and that unit counts as not landed in the compliance record. The experiment carries on with the other units.Confirming each switch
The experiment’s dates only mean something if the change really happened then. So every hour, Oxygen reads your Confirmed on when and Confirmed off when conditions from the warehouse:- At each treated unit, from its switch day to the end of the grace period, the first day the on condition holds is recorded as the day the change landed. If the grace period ends with every day read and none holds, the switch is recorded as not landed.
- At each control unit, from the first switch to the last day measured, the off condition is checked. The first day it fails is recorded as the change leaking to a control.
While the experiment is live
The page shows operations only:Why the result stays sealed
The registered result is sealed until the run reports. The page says “The registered result is sealed until the run reports; the interim below is a peek, not the result”, and the platform will not write a final result for a live run: the request is refused on the server, not just hidden on the page. This is the single most important protection an experiment has. If you check the number every day and stop as soon as it looks good, you will find “effects” in pure noise far more often than the 1 in 20 you signed up for. The test’s guarantee only holds if it is read once, at the planned end. Guardrails are the exception, because they look for harm, not for the answer.Peeking: the interim reading
People still want to know how a run is going. A live or closing run therefore shows an interim reading: the registered analysis, run over the days that have finished so far, badged Interim, not final. It is a peek at the direction and rough size of the effect, built so that it can never be mistaken for the result or change what the run does.What it shows
The interim panel reuses the report’s summary card and chart, with these differences:When it is read
- Once a day, automatically, while the run is live.
- On demand, with Refresh, for workspace members and above (the same people who can price a design). Viewers see the latest reading but cannot start a new one. One reading runs at a time per run.
- Only for live and closing runs. Before the first switch nothing has been treated, and once the run reports the report is the reading. A past-data analysis goes straight to its report and has no interim.
What it reads
The analysis refuses a window that is mostly missing, so it cannot be run on an after window that is still in progress. The interim therefore reads a trimmed copy of the design, cut at the start of today in the design’s time zone (at the current hour at hour grain, at the current week or month at those grains):- Waves that have at least one whole after-window day are kept. Waves that have not reached their after window yet are left out, and their units are in neither group.
- Every kept wave’s after window is shortened to the shortest one read so far, so all waves are compared over the same number of days.
- A switchback keeps only the on/off pairs that have finished.
- The before windows, the washout, the blocks, the seed and the control group are the registered ones.
The staggered promo from the worked examples, read as the interim reads it on each of 42 days. For its first 14 days only wave 1 has started, so the interim reads wave 1 alone. On day 15 wave 2's after window opens and every after window is cut to wave 2's single day, which is why the line dips. From there both waves are read over a lengthening window, and on the last day the interim reads +$12.30, exactly the final report's number.
Why an interim is a hint, not a result
The interval and p-value in an interim are the registered fixed-horizon ones: they are correct for a test read once, at the end. Read every day, the same test raises far more false alarms, because every reading is another chance for noise to cross the bar.A panel shaped like the example shoppers, with no effect at all, run 1,000 times: 16 treated shoppers, 24 controls, a 28-day after window. Read once at the planned end, 6% of runs look significant at 0.05, close to the 5% promised. Looked at every day of the after window, 25% of runs look significant on at least one day: 18% within the first week.
Guardrails and aborting
Guardrails
Every hour while the run is live, each guardrail is checked at every treated unit that currently has the change on (for a switchback, at every unit during “on” periods). Readings go up to yesterday, since today is not complete, and they are daily readings whatever the experiment’s grain: a guardrail cannot wait for a week or a month to finish.- A measure looks anomalous compares each unit with its own normal range, using the same machinery as anomaly monitors.
- A condition holds applies the threshold to each unit’s latest day.
Aborting by hand
Workspace owners and admins can Abort a registered or live run. The dialog asks for a reason, recorded with the run and on its report, and offers two choices for the levers:- Turn levers off: runs the off automation at every unit that is on now. Units not switched on yet are never switched on.
- Keep levers as they are: no off automation runs. The experiment stops managing every unit’s lever, so turn them off yourself when you are done.
What an abort means for the result
An aborted run is still analysed, but its measurement stops at the start of the day the abort took effect, so no day after the change was turned off is read as if it were on. At hour grain an abort part-way through a day stops the measurement at the start of that day. The report is labelled ABORTED RUN — not the registered result, with the reason and the cut-off day. If the abort came after the after windows had finished, the full measurement is read. If it came early, the windows may be too short and the estimate will refuse.Closing
When the last after-window day has passed (at hour grain, the last after-window hour), the run moves to Closing:- The change is turned off, unless At close says to leave it on. This happens on entering closing, not after the report, so a failed estimate can never leave the change running by accident.
- The carryover window is read, if the design has one: Oxygen waits that many more periods after turning the change off.
- Oxygen waits for the data. Warehouses lag, so closing waits until the last window’s coverage reaches the floor, for up to 14 days at every grain. If the data still has not arrived by then, it estimates on what is there and tells the owner. A window still below the floor is refused by the estimator rather than read as a shorter window.
- The estimate runs in the background and writes the report. While it runs, the page shows Preparing report.